Denver public works.
Gutter pan detail.
Denver public works.
Tpa 221 through wall scupper isometric tpa 222 gravel stop scupper detail tpa 232 gutter detail tpa 301 parapet wall flashing detail 8 4 9.
Splash block cast aluminum model hd5132 ab 78 98 78 98.
And details for the engineering division denver public works city and county of denver public works department approved by.
Form saw or score 1 as the curb and gutter just ahead of the taper.
Master mark block chocolate gutter down spout splash 2 pack model 32924 20 98 20 98.
Copper locking strip is soldered to the apron and engages the end of the copper roof pan.
Hold your cursor over the file name to view when a drawing was last updated.
In height to 0.
Install an 18 tie bar across the joint.
The gravel stop is fastened to the roof at its back edge with nails 3 o c.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
Denver public works.
This is an alternate eave detail and is recommended in snow areas when using a gutter.
The gutter is extended to the roof to form a flashing apron fastened to the roof with cleats at 12 o c.
Install a 1 2 premolded full depth isolation joint the same shape abut existing curb and gutter taper the last two 2 feet of the curb from 6 8.
Denver public works.
Detailed drawings single ply tpa 303 insulated parapet wall flashing detail tpa 304 high parapet wall flashing detail tpa 305 parapet wall flashing detail tpa 310 wall counterflashing detail.
This detail shows a copper gravel stop and a copper gutter supported by straps and brackets.
City engineer april 2017.
Set your store to see local availability add to cart.
Types i 6 i 8 ii 24 gutter pan iii 6 iii 8 ac dike and traffic bars curb type ii 12 gutter pan and gutter transition gutter transition detail sheet not used mountable curb for fire truck access only valley gutter at street intersection type iv 6 and iv 8 deep vertical curb street monument and monument box.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
Denver public works.
Not to scale reb january 2 1997 0.
Denver public works.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.